STATEMENT of interest in the operation of the coal mine of JSC "Shargunkumir"

STATEMENT
of interest in the operation of the coal mine of JSC "Shargunkumir"

JSC "O’zbekistan temir yo’llari" and JSC "Shargunkumir" invites all interested organizations to submit proposals for the exploitation of the coal field of JSC "Shargunkumir", with a coal stock of more than 30 million tons, located in the Surkhandarya region of the Republic of Uzbekistan.
Currently, the investment project "Modernization of JSC "Shargunkumir" is being implemented in the coal field, with the design capacity up to 900 thousand tons of hard coal per year", with the completion of works by the end of 2022.
The customer of this investment project is JSC "Shargunkumir", the general contractor is a consortium of Chinese companies "China Railway Tunnel Group Co. (CRTG) and “China Coal Technology & Engineering Group Corp” (CCTEG), on a turnkey contract.
To date, construction of 12 kilometers of underground mine workings has been completed and installation of a mechanized cleaning complex and equipment manufactured in Chinese factories and supplied by the Contractor to Uzbekistan has begun.
To date, two longwall faces have been prepared - the W01 longwall face and the E01 longwall
- W01 longwall face, conveyor drift with the length of - 1163 m, rail drift with the length of - 621 m, the length of the longwall face is 100 m, coal bed is 7-12 m thick, with the fall angle up to 45º-50º. It is planned to install 66 sections of support (guardrail-supporting with overhead release of coal on the stockpile conveyor), one combine (clearing, narrow-gripping, with a screw executor) and other auxiliary mechanisms.
- Longwall face E01, conveyor drift with length - 945 m, rail drift with length - 842 m, the length of the longwall face - 100 m, coal seam with thickness of 7-12 meters, with an angle of incidence up to 45º-50º. It is planned to install 66 sections of support (guardrail-supporting with overhead release of coal on the stockpile conveyor), one combine (clearing, narrow-gripping, with a screw executor) and other auxiliary mechanisms.
Based on the needs of production and operation of coal mines in the Republic of Uzbekistan with the complex-mechanized technology of coal mining with release on steeply inclined coal seams, JSC "O’zbekiston temir yo’llari" and JSC "Shargunkumir" offers you to submit a proposal for the mine operation (coal mining), involving highly skilled engineers and technicians, with experience in mechanized mining complex, with release in seams with dip angle to 45º-50º.
It should be taken into account that during the operation it will be necessary to attract specialists from JSC "Shargunkumir", training them in mechanized methods of coal mining, with the expectation of transferring them to the operation of the coal mine in the future.
Operation of all other mechanisms (conveyor belts, mechanisms of the coal sorting point, small and large coal release points, loading onto railway cars, etc.) and performance of works (organization of coal transportation from the working faces, coal sorting, loading onto railway cars, etc.) will be carried out by specialists of JSC “Shargunkumir”.
Estimated period of operation 3-5 years, approximate number of specialists 10-30 people (other specialists can be attracted from the specialists of JSC "Shargunkumir").
It will be necessary to take into account that the operation group will have to be present during the assembly of equipment in the longwalls, which starts with an approximate timeframe from March 1, commissioning from May 1, test coal mining from July 1, at the acceptance of the facility on August 1, 2022.
The financial part of the proposal should contain information with the coal production volumes, prices for sales and expenses of JSC "Shargunkumir".
Priority will be considered proposals, which contain the financial part of the payment, after the sale of coal, which can begin in 6-9 months from the beginning of the work.
A forecast production volume of coal for 2022 is 100,000 tons, for 2023 is 300,000 tons, for 2024 is 600,000 tons, for 2025 is 900,000 tons. Estimated price of coal in the domestic market $ 40 USD per one ton, in the warehouse of the mine.
All other necessary materials on the project to be implemented will be provided to your company after submission of the proposal, the conclusion of the Memorandum between the parties, subject to confidentiality, in accordance with national legislation.
JSC "O’zbekistan temir yo’llari" and JSC "Shargunkumir" accept your applications of interest and proposals until February 15, 2022.

Contact person: Khamza Naimovich Abdullayev, General Director of JSC "Shargunkumir"
Tel: +998 (99)-500-66-06, Telegram: +998 (99)-500-66-06
E-mail: shargunkomir@railway.uz
shargunkomir@railway.uz